Background Summary
• Installation of artificial lift equipment and applications
• Use of production optimization applications and nodal analysis to model optimum well conditions
• Planning and implementation of workover and completion procedures
• Planning, procurement and implementation of facility installations
• Use of geospatial software and GPS units to archive and plan field operations
• Experience with Perform, CAD, Dewight’s, Visual Basic, Fekete’s PIPER and VirtuWell
• Proficient in all MS Office Applications
Professional Accomplishments
• Worked with assets to increase production in fields of 15 mmcf/D to almost 30 mmcf/D over two years through workover, advanced completion techniques and strategic infill drilling.
• Aided in planning and directed the installation of 18,000 Bbl/D, $6.2 million waterflood facility. This project was completed on-time, without any reportable injuries, and enough money was remaining in the budget to allow for a separate 2000 Bbl/D wastewater disposal facility to replace the need for hauling at the waterflood facility.
• Planned, procured and oversaw construction of gas handling facility to handle increased heavies and double gas processing capacity from 10 mmcf/D to 20 mmcf/D.
• Worked in conjunction with electrical engineering consulting firm to plan and install 3-phase electrical grid in field to power process and production equipment.
Employment History
• Fidelity Exploration & Production Company (MDU Resources) – August 2006 to June 2009
Operations Engineer – Houston, TX – Pr...
Login or Register to view the full resume.