PROFESSIONAL EXPERIENCE:
October 2012- Present
Tsiouvaras Simmons Holderness, Inc. – Project Engineer
Responsibility – Complete design of bridge structures including, substructure, superstructure, geometry control, all calculations required for permitting and construction drawings.
Specific Key Project Experience –
• Boulder Junction, Goose Creek – Location Boulder. Complete design for cast in place reinforced concrete bridge. High geometric complexities including 275 foot radius and 56 degree skew.
• North Meadows, Plum Creek – Location Castle Rock. Substructure design for over 60 foot tall piers.
• Misc – Construction oversight for rural pre stressed concrete slab bridge south of Fort Collins.
October 2011- October 2012
Summit Engineering Group Inc. – Bridge Designer/Construction Engineer
Responsibility – Designed contractor alternate bridge design for prominent Colorado bridges and temporary structures. Created demolition and erection plans for various bridge structures.
Specific Key Project Experience –
• Bronco Bridge – Interstate 25 and 17th. Full depth precast panel, substructure analysis.
• I25 & Santa Fe – Location I25 and Santa Fe. Over saw RFI and implementation of recommendations. Attended weekly meetings during construction.
• Misc – Design temporary bridge structure for construction of railroad bridge in Nebraska
August 2010 – December 2010
University of Toronto – Research Assistant
Responsibility - Non-linear finite element analysis of steel skinned composite concrete panels and literature review
February 2007 – July 2009
DCI Engineers, Seattle WA. – Structural Project Engineer
Responsibility – Key team member on various projects, worked with and managed team to meet deadlines. Designed structures with wide variety of materials using several software packages.
Specific Key Project Experience –
• Wood Projects - Pentecostal Church, Hofmann Apartments, Walton Place Housing One, Hillside Inn
• Industrial Steel/Concrete - Janicki Building 5, Korry Electronics
• Cast in Place Concrete/Prestress - Colby Tower 12 story tower, Fairhaven Complex 8 story tower
• Steel/CMU - Lacey Crossroads building K, Skagit Administration Addition, Raidon Dodge. Several Wells Fargo Bank branches
• Rehabilitation- Skagit Valley Hospital Cath Lab, Everett Washington Public Utilities Buildings,
June 2006 – December 2006
M.A. Mortenson Company, Denver CO – EIT Rotation
Responsibility /Experience – Estimating cost of large scale projects.
Specific Key Projects: Balfour, Mile Hi Church, Stapleton Development, National Renewable Energy Laboratories. .
EDUCATION:
University of Toronto- Master of Engineering, Structural - G.P.A: 3.7
Graduation – December 2010
Colorado School of Mines – Engineering, Civil Specialty - GPA: 3.45
Graduation: May 2006
Honors: Fall 2002-2005, Spring 2003 - 200...
Login or Register to view the full resume.