Wesna

10/21/2014
Unknown

Position Desired

Construction Engineering
Washington, WA
No

Resume

CURRICULUM VITAE

Wesna


PROFILE

• Master in Civil Engineering.
• Excellent communication skills in English and Serbian.
• Reliable and professional.
• Ambitious and responsible, ready to learn permanently and improve her skills.
• Versatile and adaptable, ready to accomplish assignments, regardless of pressure or other work conditions.
• Determined and communicative, able to work on self initiative as well as part of a successful team.

PROFESSIONAL EXPERIENCE

• Studiously and well done graduate work on the subject: ASSESSMENT AND STRUCTURAL REHABILITATION OF THE BEARING STRUCTURE OF THE MACHINE ROOM AND BUNKER AT FACTORY 'VISKOZA' IN LOZNICA, SERBIA, rated as one of the best works in recent years.
Master - Research work: Application of Carbon Fibre Reinforced Polymer (CFRP) for strengthening RC structures.
The influence of temperature on RC beams strengthened with externally bonded CFRP reinforcement
An example of use of CFRP for strengthening crane path in case of increasing capacity of the crane.

• I applied for PhD student position on the project “Towards the development of Carbon dioxide neutral renewable cement (BioCement)” at Delft University of Technology. Among 45 candidates I had a chance to be elected in the first top 5 candidates who have been interviewed.

• Part-time work in design office ‘W-ING SOLUTIONS’ Ltd. in the period from March 2009 to January 2011.
Work on projects of residential buildings and structures.
Participation in the assessment and structural rehabilitation of buildings.
Finding solutions, drawing details and giving proper advices for choosing appropriate materials

• Part-time work for the company ‘KENZAI GROUP’ d.o.o. Belgrade in the period from June 2009 to February 2011.
 Work on the final floor layers and bearing floor layers (use of polymer-modified cement mortar for making self-leveling floor screeds, fast binding cement mortar for leveling floors, etc.)

• Projects during the study:
Assessment and structural rehabilitation of bearing structure of the building ‘Clinical Center ’ – lamella D in Novi Sad, Serbia.
Production systems in construction industry.
The main project of construction.

• Profession...

Login or Register to view the full resume.