MW

12/3/2014
Fort Mill, SC

Position Desired

Structural Engineering
Anywhere in the U.S.
Yes

Resume

EDUCATION

West Virginia University - December 2007
Bachelor of Science in Civil Engineering
Emphasis in Structures

West Virginia University - December 2001
Bachelor of Arts in Geography

EMPLOYMENT HISTORY

-Senior Structural Engineer, URS Corporation, September 2012 – present
+Prepare and check structural design calculations and design criteria for reinforced concrete and steel nuclear power plant structures using ACI, AISC, ASME, and AWS codes as well as NRC Regulatory Guides and Standard Review Plan for the AP1000 and US-APWR nuclear power plants
+Provide design modification calculations for change-order packages in support of construction of new nuclear power plants
+Develop calculation methodologies and troubleshoot problem areas both independently and as part of a team for reinforced concrete, steel, and prestressed concrete structures
+Resolve construction non-conformances, requests for information, component installation conflicts, and proposed design changes on-site at V. C. Summer Nuclear Power Plant Units 2 & 3 construction site

-Field Engineer, Finley Engineering Group, December 2009 – June 2012
+Served as on-site design and construction consultant for the Pennsylvania Turnpike on the Monongahela River Bridge (Mon-Fayette Expressway Section 51H), a $90M+, 3,022’ long, 229’ high, seven-span segmental post-tensioned concrete box girder bridge built cast-in-place with form travelers
+Provided field coordination and management of critical construction procedures including bridge cantilever vertical alignment and longitudinal jacking, complex sequentially staged operations, and falsework construction
+Provided quality control and inspection of post-tensioning system installation and jacking, tendon grouting, rebar and formwork installation, concrete placement, and many other construction activities
+Worked with project owner, designer, contractor, consultants, and on-site inspection staff regarding project issues and progress
+Reviewed project submittals and provided comments with respect to compliance with project specifications and general construction standards

-Project Engineer, Brayman Construction Corporation, January 2008 – December 2009
+Served as contractor’s on-site project engineer for the I-64 Kanawha River Bridge in South Charleston, WV, an $80M+, 2,975’ long segmental post-tensioned concrete box girder bridge with a United States record box girder span of 760’
+Designed bridge falsework and concrete formwork with structural modeling software and hand calculations using AISC and NDS codes:
---Fals...

Login or Register to view the full resume.