SKILLS
OS: Windows Suite, Mac OS X and Linux
Software: MS Office XP, Word, Excel, PowerPoint, Project, Scientific Notebook, SolidWorks ’02- ‘03, Cosmos Applications, AutoCAD, Autodesk, LFACS, PRISM, EWOMS, Lotus Notes, IVAAP, BAARS-CMA, LIES, ICGS/IDDS, Broadband Data Management System (BDMS).
Other: Experience with LAN/WAN network architecture, Telecom Network provisioning protocols, mechanical machining and assembly, fiber design management, including cutting and splicing.
EXPERIENCE
12 Or Less LLC – Matawan, New Jersey
Founder/Business Development Manager 5/10 – Present
•Initiated the development of a new project venture to introduce a new form of short distance commercial transportation.
•Introducing an online service platform to market and distribute content from one of major international movie industries.
•Managed all aspects of the project development plan, to include permit acquisition, funding, regulatory compliance and service development.
•Providing vision and marketing strategy to garner community support.
Verizon Communications – Madison, New Jersey
Project Mgr/Vendor & FTTP Coordinator 6/05 – 12/08
•Managed the ongoing design and build of the fiber network for my region, to include management of resources, vendors and construction within a Project Manager role
•Managed individual projects for road widening, pole relocations, cable replacements and relocations from aerial to underground or buried or vice versa within my territory of responsibility. This includes coordinating all necessary permits, city notifications an construction crews.
•Led efforts as point of contact for the district’s Multi-Tenant Unit (MTU) 2008 objective, providing provisioning solutions for a multiple tenant type building, interacting and managing customer relations to that end.
•Responsible for providing or maintaining a clear path on aerial, buried or underground facilities. This includes duct reconstructions, snaking and clearing ducts as well as coordinating the mark-out process to identify proper utilities clearances.
•Spearhead the creation/integration of the Held for fiber Network provisioning team, within the northeastern Engineering region. In this position I responded to technical fires and executive escalations, where I served as primary liaison support across organizational boundaries to generate immediate response with a solution.
•Led, trained and managed team members and team deliverables of this Held for Fiber Provisioning team, within my district. I assisted in providing direction, support and overall management, in a context of no official leadership title.
•Managed the homes validation process for multiple dwelling units (MDU) and single-family homes (SFU) in preparation for content delivery of FIOS products from the central office to the Set Top Box (STB) at a customer’s home/office.
•Responsible for quality control and redlining CAD Aerial and underground prints from vendors being held accountable for their design, travel path and fiber count on Verizon’s IDDS/ICGS graphic system.
•Managed and facilitated vendor and contractor relationships in connection with on-going projects, including aerial, underground and buried print design, and outside plant construction of our SFU, MDU and MTU fiber distribution network.
Russell-Stanley Corporation, Woodbridge, New Jersey
Project/Plant Engineer 5/04 – 6/05
•Designed systems, protocols and plant manufacturing equipment using 2D/3D CAD systems, to be used in the manufacture of products, to help streamline production.
•Assisted in introducing robotic applications and solutions to machinery within the company, reducing manpower and in-turn reducing cost of production
•Using project management principles and tools, managed all aspects of small and complex design projects from idea to build, including but not limited to justification proposals for budget requirements, tracking, and working with vendors and contractors.
•Performed routine tests and troubleshooting of newly installed machinery and systems, with a great deal of hands on involvement, within a team environment.
•Managed overall scope, time and resources for install and maintenance crews during the build and pilot stages of both our small and complex projects.
•Ha...
Login or Register to view the full resume.