RESUME
SUMMARY OF EXPERIENCE:
Department manager, Lead Instrument Engineer responsible for the engineering, design, procurement, construction, commissioning and start-up of major domestic and international chemical, petrochemical, refining, production, storage and shipping facilities.
Extensive experience in control center design, process automation, application of computer, distributed control and PLC technology to continuous and batch process control systems, automated analysis systems, emergency shutdown systems, fire and gas protection systems, gas and steam turbine driven machines, furnaces and power generation. Comprehensive experience working with a wide variety of field instrumentation.
Responsibilities include development of control system specifications, control system application and configuration procedures and conformance of all computer and control systems to applicable standards, specifications and codes. Prepare engineering estimates, schedules and budgets; supervise control system engineers, designers and constructors, personnel in the specification, selection, design, procurement, installation, commissioning and start-up of all control systems and components.
INDUSTRIES/TECHNOLOGIES EXPERIENCE:
Oil Production (on shore), Flare systems, Boilers, Wet gas scrubber, polysilicon & silicon purification process control, Ethylene, C5/C6 Isomerization, Alky ReVAP, Clean Fuel, Sulfur recovery, De-Coking, Batch Processing, Bulk Handling & Storage, Caustic - Chlorine, Gas Turbine, Instrument Modernization, Oil & Gas Production, Petrochemicals, Pilot Plant, Plastics, Polyethylene, Chemical demilitarization, Power, Production/Pipelines, Pump/Compressor Station, Refinery Products & Gases, Refining Processes, Safety Relief Devices, SIS, Shutdown/Turnaround, Solids Handling, Wastewater Treatment. Also well versed in INtools program.
SIGNIFICANT EXPERIENCE:
WORLEYPARSONS (Nov. 2011 to Present)
(Arcadia, CA)
SENIOR SUPERVISING LEAD ENGINEER
In This capacity I am responsible to implement the Safety/Environmental IL Rated IPF’s into new SIS system (using Honeywell safety manager Release 150 to protect and safely shutdown the oil production sites) as well as evaluation of SIL/LOPA for all BPXA production facilities in Alaska.
BRINDERSON ENGINEERS & CONSTRUCTORS (Apr. 2011 to Nov. 2011)
(Costa Mesa, CA)
E&I DEPARTMENT MANAGER
As E&I department manager I was responsible for the staffing of all projects, tracking the available budget for each project as well as time schedules. I was responsible to provide quality engineering and design services to all projects requiring electrical and instrumentation work. My responsibility also included recruiting, and evaluating the effectiveness and productivity of all individuals working in my department. Closely involved in the I&C and electrical design work for projects such as design and installation of Hypure Bleach, HCL plants for Olin using Emerson Delta V DCS, VRU units for CTO (Chevron)using GE FANUC PLC 90-30 series, Loading terminals, OSBL for NRG combined cycle peak pick up power plants in California.
POLY PLANT PROJECT, Inc. (Sep. 2010 TO Apr. 2011)
(Burbank, CA.)
As a contract I&C engineer was responsible to prepare data sheets for flow, pressure, level, and control valve (over 1500 instruments) for a 1500MTY silicon purification plant in Shansheng, China.
EICHLEAY ENGINEERS INC. OF CALIFORNIA (Sep. 2008, to Nov. 2010)
(Long Beach, CA.)
I&C DEPARTMENT MANAGER
In this capacity I was responsible for setting up the I&C department in our Long Beach office. Site visits, direct contact with our clients, preparation of new proposals and bid packages. Setting standards to be used by the department. Recruitment of engineers and designers to support I&C activities for all in house projects. Enforcement of company policies. Participation in the Valero Benicia FGS project and updating all instrument data sheets that were originally prepared by SNC, as well as loop diagrams, wiring diagrams into the Valero INtools data base.
JACOBS ENGINEERING (April 2007, to August 2008)
(Cypress, CA)
CONTROL SYSTEM LEAD
BP Cherry point refinery Atmospheric Relief valve project
(September 2007 to August 2008) Level Indication Enhancement
Boiler/Heater emission enhancement
In this capacity I was responsible for the management of the control system team as well as all BP Cherry point refinery projects. Included are connection of all atmospheric relief valves to flare, improving the level indication of all critical vessels by adding new level transmitters, installing two new boilers and enhancing all burners and adding SCRs to lower the emission gases to safest possible levels using Honeywell C300 DCS system & Safety Manager release 1.1 . Determination of the SIL of a SIF via fault tree Analysis.
CONTROL SYSTEM ENGINEER VI
ConocoPhillips Company Rule 1108.1 Wet Gas Scrubber
(April 2007 to September 2007) ConocoPhillips Company
Wilmington Refinery
In this capacity I was responsible for preparation of complex logic diagrams for each process control.
Design of control system for wet gas scrubber of FCC unit at CONOCOPHILLIPS refinery in Wilmington, California.
FLUOR DANIEL Corp. (Nov. 1999 to April 2007)
PRINCIPAL DESIGN ENGINEER
2007 Moses lake Expansion project Solar Grade Silicon, LLC
(March 2006 to April 2007) Moses Lake, Washington
As principal I&C design engineer were responsible for overseeing the selection and purchase of level instrument, gas racks Relief valves, control valves, flow meters, thermo-wells & temperature elements.
PRINCIPAL DESIGN ENGINEER
C5/C6 Isomerization Complex Petrotrin P-a-P Refinery
(Sept. 2005 to March 2006) Pointe – A – Pierre, Trinidad
As I&C lead engineer I was responsible for the design and construction of the Isomerization control system as well as management of manpower, budget, and quality of design, time schedule and safety in design. This was part of clean fuel project.
SENIOR DESIGN ENGINEER
Alky ReVAP/Expansion Project VALERO Wilmington Refinery
(Feb. 2005 to Sept.2005) Long Beach, CA
In this capacity I was responsible for the design of control system of boiler and its BMS, Alky system, HF analyzer, SIS system and logic narratives for both systems.
SENIOR DESIGN ENGINEER
Marathon Ashland Clean Fuel Project Marathon Ashland Refinery
(Aug. 2004- Feb. 2005) Robinson, IL
In this capacity I was involved with instrument installation, loop check for the clean fuel project at this refinery.
SENIOR DESIGN ENGINEER
Fluor Corporation
(Dec. 2003- Aug.2004) Prop...
Login or Register to view the full resume.