PROFESSIONAL OBJECTIVE
To secure employment as an engineer with a company that promotes continued learning and demonstrates growth with a team-oriented environment that will utilize my skills developed through both formal education and fifteen years experience in the manufacturing industry.
EXPERIENCE
2011 – Current Guardian Automotive Industries Auburn, IN
07-2011 – Current
Process Reliability Engineer
§ Create process and equipment parameter sheets, limits and preventative maintenance procedures.
§ Procurement of injection molding and assembly equipment, adhesive delivery systems.
§ Identify, analyze and review process interruptions and determine corrective actions to resolve issues.
2010 – 2011 Johnson Controls Interiors Manufacturing Kendallville, IN
11-2010 – 07-2011
Process Engineer
§ Sample new and existing tooling to isolate design issues pertaining to fit, form, and function required by Ford, Toyota, Honda, General Motors, and Chrysler.
§ Implement and modify safety standards, work instructions, and process characteristics within an injection molding environment.
§ Train 4 molding technicians and 3 material handlers of new technology as needed and be the driving force to achieve daily production demands.
2009 – 2010 BAE Systems Fort Wayne, IN
10-2009 – 11-2010
Operations Associate
§ Execution of planning functions and vouchering of required time to WIP jobs in AEGIS ERP system.
§ Military J-STD-001 operational understanding of soldered electrical joints of digital and analog PWBs.
§ Installation of electrical components to powered wire boards for F18, F22, and JSF fighter series jets.
1996 – 2009 Robert Bosch Automotive, LLC Albion, IN
03-2008 – 05-2009
Process Engineer / Technician
§ Established all process characteristics and performed all in-house samples of new injection molds with a 100% on-time delivery to schedule.
§ Assisted in developing of new injection mold process standards to assure optimized manufacturing performance.
§ Conducted Design of Experiments to investigate and define key characteristics of the injection molding process.
11-2007 – 02-2008
Special Projects Technician – 4 month assignment
§ Served as a department representative to evaluate an injection molding and stamping facility for possible outsourcing of low-volume products.
§ Compiled sample processes, press parameters, and RJG reject limits into an Excel™ master spreadsheet.
§ Created instructions to standardize press set-points, mold characteristics, and RJG reject control limits.
10-2002 – 10-2007
Lead Mold Technician
§ Communicated mold failures and design issues to both Too...
Login or Register to view the full resume.