PROFILE
Mr. Aggarwal has technical experience in superstructure as well as substructure bridge design. He also has experience in schedule preparation, quantity calculation, and efficient management of budget and hours of a project. He is proficient at effectively leading tasks and completing assignments under given deadlines. With a master’s degree in civil engineering and a total experience of more than 3 years, he looks forward to a more field based role which would enable him to apply his learning in a practical environment.
EDUCATION
Aug 2012 – Dec 2013 Pennsylvania State University, State College, PA
Masters in Structural Engineering
Aug 2006 – May 2010 University of Delhi, New Delhi, India
Bachelors in Civil Engineering
EXPERIENCE
JACOBS ENGINEERING GROUP Dallas, TX
Bridge Structural Engineer Mar 2014 – Current
¥ TXDOT, SH 199 Project (PS&E), Fort Worth, Texas
o Scope: To design four bridges; EB/WB Cottonwood Creek and EB/WB Hanger Cutoff Rd.
o Responsibilities:
▪ Designed EB/WB over Hanger Cutoff Rd.
▪ Superstructure design
▪ Establishing geometry(BGS)
▪ Prestressed concrete beam design (PG Super)
▪ Haunch design
▪ Substructure design
▪ Establishing column heights
▪ Working point elevations
▪ Multi-column bent design on drilled shafts
▪ Abutment design
▪ Designed Retaining /Drilled Shaft Walls
▪ Marking up, back-checking, and updating superstructure and substructure sheets
¥ TXDOT, SH 360 / IH 30 Interchange Project (PS&E), Dallas, Texas
o Scope: To design the SH 360 / IH30 interchange, this contained five main lane bridges and 3 direct connectors.
o Responsibilities:
▪ Designed 3 main lane bridges & 1 direct connector which included designing of superstructure (girders) and substructure (Multi-column bents, Abutments)
▪ Designed Inverted Tee, Rectangular, Hammerhead bent caps and footings.
▪ Prepared drawings, quantities and cost estimate
▪ Marking up, back-checking, and updating superstructure and substructure sheets
¥ KYTC / IFA, Ohio River Bridges East End Project (Design-Build), Louisville, KY
o Scope: This project is to design and construct two signature cable stayed bridges over the Ohio River; including the roadways and structures of the surrounding areas on both sides of the Ohio River.
o Responsibilities:
▪ Bridge load rating of Wolf Pen bridge
▪ Deck design of Approach bridge
▪ Steel design of pedestrian fence
¥ IH 45 – Widening
o Scope: Bridge Condition Evaluation Report for 32 Bridges
o Responsibilities:
▪ Site visits were conducted to determine existing structural capacity of bridges
▪ Responsible for development of structural details for widened structures
▪ Determined required repair or remediation procedures and final structure types and configuration
▪ QC the geometry & girder design
¥ Dallas County, Medical District Drive (PS&E), Dallas, Texas
o Scope: To design a Rail Road Bridge
o Responsibilities:
▪ Designed Retaining /Drilled Shaft Walls
▪ Steel walkway plate girder design
▪ Connection design (Steel angle & Bolts)
▪ Produced sheets for submission
JACOBS ENGINEERING GROUP New Delhi, India
Assistant Engineer Jun 2010 – Jun 2012
¥ Projects: Widening of Udham...
Login or Register to view the full resume.