SUMMARY
Engineering and supervisory experience includes the nuclear power industry; DOE and DOD weapons, waste storage and processing facilities; nuclear submarine overhaul and refueling; and aerospace industry. Positions included Proj Mech Engr, Engineering Mech Dept Supervisor, and Sr QA Engr in the nuclear power industry; and Principal Engr in systems and projects, Configuration Mgmt Engr, Technical Baseline Change Control Coordinator and Senior Systems Engr at DOE facilities. Areas of experience include Nuclear Steam Supply Systems engineering; QA technical auditing; Construction, Start-up, Operations, Maintenance, and Outage Engineering and Supervision. Held “Q”, Secret, and other security clearances in DOE, DOD, and the commercial nuclear power industry.
EXPERIENCE
Senior Systems Process Engineer 10/06/08-08/19/12
CMRR Project
Los Alamos National Security, LLC. Los Alamos, NM
Worked on the DOE Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement (CMRR) Project with the following responsibilities:
As Senior Systems Process Engineer in the Mech Group in the Engineering Dept of the CMRR Project, provided systems engineering services including the following:
• CMRR NF Technical Baseline Change Control Coordinator
• Implementation of the authorization basis (F&OR);
• Technical baseline maintenance;
• Developed engineering study and design scope requirements;
• Reviewing the CMRR Project to ensure that the designs comply with LANL, State, Federal, and U.S. DOE requirements.
Specific Activities:
• My final position was as the Nuclear Facility (NF) Technical Baseline Change Control Coordinator reporting to the CMRR Engineering Manger. Major Functions included:
1. Coordinating with CMRR Engineers/Safety Basis Group & Sub-Contractor AEs to create Technical Change Requests (TCRs) for changes to the technical baseline.
2. Interfacing with TCR Reviewers in creation of their review/analysis for resolution of comments/questions.
3. Coordinating with CMRR Document Control to identify, transmit for signature approvals, turnover to Document Control and close out TCRs
4. Maintaining Technical Baseline Change Control procedure
• Developed the Vibration Predictive Maintenance Program for the RLUOB rotating Equipment.
• Submitting Plan and Scope to Management and Sub-Contractor to complete RULOB Fire Hazard Analysis (FHA) and Fire Protection SDD. Supported Sub-Contractor in resolving comments from CMRR Engineering and resolution of exception List. Creating scope of work for sub-contractor to produce equivalency reports for resolving items on the list of exceptions
• Coordinating activities of the Sub-Contractor Contractor Team updating System Description Documents (SDDs) and System Data sheets (SDSs) for RLUOB Project Engineer, including scheduling, coordinating review and approval of SDDs and SDSs and reviewing final Closeout Report from Sub Contractor and submitting Report into Document Control.
• Coordinating activities of the Sub-Contractor resolving outstanding items (TBDs & TBVs) identified for the SDDs & SDSs, including scheduling, coordinating review of TBDs & TBVs and reviewing final Closeout Report from Sub Contractor and submitting Report into Document Control.
• Coordinating the revision of the CMRR Program Requirement Document (PRD) with NNSA counterpart and issued CMRR Functional & Operational Requirements (F&OR) document.
Senior Engineer/System Engineering Specialist 02/2001-04/2008
Engineering / Discipline Engineering / System Engineering
Bechtel SAIC Company, LLC, Las Vegas, Nev.
Worked on the DOE Civilian Radioactive Waste Management System Yucca Mountain Project with the following responsibilities:
(10/2006-04/2008) As Senior Engr in the Engineering Dept, responsibilities included:
• Allocated initial requirements to engineering and to specific disciplines and facilities;
• Broke down and rewrote high-level requirements to be discipline and/or facility specific;
• Determined how engineering's requirements are to be implemented;
• Documented and maintained configuration control of engineering’s requirements and links to implementing mechanisms;
• Produced design criteria documents;
• Conducted Self-Assessments;
• Prepared Criteria/Basis Change Notices to the Project Design Criteria Document for the System Engineering Manager;
(04/2006-10/2006) As Requirements Management Analyst in Organization Assurance Dept, responsibilities included:
• Facilitated implementation of the RM Program through both written and verbal interactions providing guidance, direction, interpretation, and coordination with the program participants (primary organization managers, requirements area owners, system facilitators, requirements subject matter experts);
• Evaluated condition reports including assessing extent of condition, performing causal analysis, and preparing corrective action reports;
• Conducted Self-Assessments;
(02/2001-04/2006) As Senior Engr and Lead Discipline Checker for different organizations within the Engineering Dept, responsibilities included:
• Prepared the Project Design Criteria Document;
• Checked, reviewed and coordinated reviews of procedures, calculations, reports, System Description Documents, selected D&E documents, License Application Chapters, etc.;
• Supported creation of Requirements and Criteria documents;
• Reviewed technical design and scientific documents such as System Description Documents, calculations, analyses/models, and technical reports to evaluate/assess the System Engineering Departments checking function and improve the quality, transparency, and defensibility of the documents with respect to technical accuracy and program compliance.
Systems Design Engineer 07/1997-07/2001
Engineering Department
Duke Engineering & Services, Las Vegas, NV
Worked on the DOE Civilian Radioactive Waste Management System Yucca Mountain Project with the following responsibilities:
(07/1998-02/2001) As Lead Discipline Checker in the Product Checking Group within the Engineering Department, performed the same functions/duties as identified for BSC, except primarily supporting the System Engineering Department instead of both departments.
(07/1997-07/1998) As Senior Design Engineer in the Engineering Dept, performed the following:
• Prepared Compliance Program (CP) Guidance Packages and inputs to technical and regulatory criteria and requirements documents.
• Performed reviews and analyses of regulatory requirements through implementation of the CP.
• Reviewed project quality affecting Engineering documents.
Principal Engineer 06/1990-07/1997
Site System Engineering Department
Westinghouse Savannah River Company, Aiken, SC
Provided engineering technical support for the Site and Facilities as described below:
• Authored site level technical policies, procedures, and project specific engineering documents.
�...
Login or Register to view the full resume.