OBJECTIVE
Looking for a challenging position of a Project Manager (Mechanical) / Sr. Project Engineer (Mechanical) in the Industry

SUMMARY

Mechanical Engineer with 16 years of experience in industrial project engineering and project management, including 9 years in the pulp/paper and chemical industry. Strong multi-discipline engineering knowledge with direct experience in managing small, medium and large-scale capital projects from conception to completion. Possess excellent project leadership, communication and interpersonal skills. Willing to explore opportunities in other industry. Open to travel and relocation.

PROFESSIONAL EXPERIENCE

Project Manager – Ford Bacon & Davis LLC, West Monroe, LA (May 2013 - June 2014) Contract Position (Assignment completed)
• Responsible for Capital Project Management at International Paper’s Orange, TX and Bogalusa, LA Mills
• Installed Burner Management System for the Recovery Boilers 1 & 2
• Designed and Replaced 13.8 kV Load Break Switch for the Chemi-Washer
• Managed 44 MW Steam Turbine Generator rebuild with GE Energy Services

Project Manager - BASF, Wyandotte, MI (April 2012 - May 2013)
• Responsible for Capital Project Management at BASF sites in Michigan, Pennsylvania, and Ohio
• Replaced 1275 psi Gas Fired Steam Boiler
• Replaced 15 ton and 10 ton Chillers
• Installed Dust Collector for Hydrogen Reduction Tower
• Upgraded 30 ton HVAC System
• Installed Chemical Reactor Cleaning system
• Started Mechanical Integrity program for Fixed Equipment (Storage Tanks/Pressure Vessels)

Senior Project Engineer - Georgia Pacific, Perdue Hill, AL (September 2008 - April 2012)
• Responsible for Capital and Expense Project Engineering for Powerhouse (Utilities), Fiberline, Product Unit and Woodyard
• Upgraded Recovery Boiler Vent Stack Scrubber to meet Environmental Compliance, involved piping design, selection of Scrubber Pump, Fan, Demisters and Venturi
• Installed Steam Traps on the 1200# Steam Headers, 1200psi/170psi PRVs to prevent line hammering, included selection of Steam Traps and piping design
• Pipe Hanger Upgrade, worked with a Consultant to repair and replace Pipe Hangers on the 1200 psi Steam Line in the Utilities Area
• Installed Face Wire Cleaning Shower on the 4th Brown Stock Washer and Bleached Decker included piping modifications, resulted in improved washing and drainage, and overall chemical savings
• Upgraded Lime Kiln Chain with Jammbco Chains, resulted in better and efficient Lime Mud drying and increased fuel savings
• Replaced Falling Film Surface Condenser
• Replaced Tanks at the Crude Tall Oil and Chlorine Dioxide Plant
• Replaced Tertiary Rejects Screen Tank and Pump
• Upgraded the Bark Hog System, resulted in reduced opacity in the Bark Boiler
• Upgraded Mill Wide Security System

Senior Process Engineer - MeadWestvaco, Covington, VA (September 2006 - August 2008)
• Responsible for production and project management in the Brownstock Area
• Assisted with troubleshooting operational problems at the Brownstock Area, Optimizing Batch Digesters and Brown Stock Washers, Assisting with Mill Outages, MOC process, PSM training, maintained critical equipment such as Kappa Analyzer and Titrators
• BSW Project, worked with Eng. Department, replaced the First Stage Hardwood Brown Stock Washer, improved washing and reduced chemical usage (Hydrogen Peroxide)
• Softened Water Project, provided softened water to CB Washer Blower Seals, increased reliability and reduced production downtime
• Installed Techpap Dirt Analyzer, to track Dirt and Shive Count in the pulp from Primary Accepts Screen of the Hardwood Line, helped improve digester cooking
• Installed online White Liquor Analyzer, reduced Batch digester cooking variability
• Upgraded Talc System for Hardwood line, reduced pitch count and chemical usage

Project Engineer - International Paper, Pine Bluff, AR (July 2005 - August 2006)
• Responsible for Capital Project Management for the Fiberline and Utilities Department
• Decker Filtrate Recycle Project, modified piping, installed Filters, achieved savings on Mill Water and Steam usage (
• High Gradient Electromagnetic Filter Project, reduced iron deposits in the boiler condensate return lines
• Millwater Pump Upgrade, installed VFD pump, achieved energy savings and eliminated mill shutdowns related to poor pump reliability
• Brown Stock Pulp Washing Improvements, improved 1st stage washing with replacement of two washer drums
• Soap System Improvement Project, improved softwood soap removal, improved washing effic...