Work Experience:
Clipper Windpower, Inc.: Technical Documentation Engineer July 2010‐ September 2012
Responsibilities
o
Manage all major projects assigned to the group
o
Create and maintain engineering documentation by working with subject matter experts
o
Develop and enforce technical documentation standards
o
Internal Auditor‐ ISO90001 Certified
Information Technology Services: Civil Engineering Intern September 2006‐ July 2010
Responsibilities
o
Update all telecommunications information outside the plant throughout provided area with AutoCAD
o
Update all information for the telecommunication services within each building provided with AutoCAD
o
Manage all other student employees work
Engineering Experience:
Wastewater Treatment Upgrade, Lakeview Knolls, North Liberty, IA January 2009‐ May 2009
Objective: Design a viable upgrade for the current system to meet 2009 NPDES standards
o
Arranged site visits and constructed three options for a system upgrade with disinfection
o
Prepared a formal team presentation and report
Phytoremediation Design Upgrade, Stanwood, IA January2009‐ May 2009
Objective: Collaborate with Ecolotree, Inc. to design a phytoremediation system to meet new NPDES standards
o
Consulted with the current operator on‐site and modeled infiltration with Hydrus for final design
o
Developed a report and presentation for final design as a team
Arsenic Treatment Design, Pond Union Elementary, Wasco, CA September 2009‐ November 2009
Objective: Design an arsenic removal system for the school’s drinking water source
o
Formulated and evaluated five different design options using EPA approved methods
o
Presented a formal design report and presentation as a team
Pilot Wetland Analysis, Iowa City, IA September 2009‐ December 2009
Objective: Evaluate TKN rem...
Login or Register to view the full resume.