Alexander N. Michailuk
OBJECTIVE To obtain a challenging position offering opportunities to utilize my project management and leadership skills to enhance production processes in the fields of construction and engineering.
EXPERIENCE b
05/2012 - Current The Green Panel, Brighton, Michigan
Engineering Technician responsible for design, layout and installation of solar array and 4G Mobile Communication equipment.
Duties:
• Created solar array As-built drawings in AutoCAD 2010.
• Responsible for detailing solar array layouts.
• Performed solar array installations per As-built layouts.
• Configured solar array monitoring systems (Enphase, SMA, and Fronius).
• Supervised installations of Sprint 4G Mobile communication equipment.
• Responsible for A/C power hook-up to Sprint 4G mobile equipment.
• Prepared quotes and proposals for clients.
2008 - 2011 City of Ann Arbor, Ann Arbor, Michigan
2010 - 2011 Surveyor performing topographic land surveys, bench loops, and open traverse.
Duties:
• Responsible for construction staking of curb, sidewalk, road and water main.
• Experience using surveying total stations, data collectors and smart levels.
2008 - 2010 Field Technician responsible for managing and overseeing water main and road resurfacing projects.
Duties:
• Managed/Inspected construction crews installing water mains and storm sew...
Login or Register to view the full resume.