Michaela

2/15/2015
Miami, FL

Position Desired

Construction Engineering
Miami, FL
Yes

Resume

MIHAELA-ELENA TOMULESCU

OBJECTIVE

Experienced Senior Cost Estimator/ Scheduler, detail oriented, receptive to new technologies and their applications, strong analytical skills, good team player, wishing to find a position in a company offering growth opportunity. I am willing to take authority and responsibility, to identify and accept challenging assignments. I am forceful and committed, willing to achieve measurable results. I value honesty, integrity, respect, excellence and I recognize importance of team work.

EMPLOYMENT HISTORY
Chief Estimator at MT Projects Controls Corp 2012 – present
MTPC Corp. is a professional consulting firm that offers services on construction cost estimating, scheduling for programs/ projects for all kinds of industry and civil engineering design.
• Yakult U.S.A. Plant Project, Fountain Valley, CA, USA – Electrical takeoff and estimate, detail breakdown for electrical work.
• Treasurer for Grapetree Townhomes Condominiums of Key Biscayne, Inc
Independent Estimator & Community Association Manager July 2010 - 2012
• analysis of buildings for reserve study
Senior Estimator/Scheduler - Post Buckley Schuh & Jernigan, Miami 2007-July 2010
Extensive project experience at Project Controls Department:
Educational Facilities
• School Board of Broward County (SBBC) - Several projects
• Miami-Dade County Public Schools (M-DCPS) - Multiple projects
• Miami Dade College – Downtown Van Dyke Building 9000
Ports
• Port Canaveral Cruise Authority, Disney Cruise Terminals No. 5
• Port of Miami, Cruise Terminal Improvements, Miami, Florida
Cities, Parks and Recreational Facilities
• City of Miami Beach, Parking Garages and Office Buildings
Transportation:
• Miami-Dade Expressway Authority- Several projects
• Florida Department of Transportation - various districts- Several projects
• City of Norfolk Light Rail Transit Project
• Florida's Turnpike Enterprise - 8 Service Plazas Replacement Project (Including LEED Cost Impact)
Airports & Fire Stations
• Holloman A.F.B, New Mexico
• Northwest Florida Regional Airport, Terminal Additions Project
• Fire Station No 39 Repairs and Miami Dade County Fire Rescue Department
Medical Facilities
• University of Miami – Clean room for laboratory
• Elias Hospital, Bucharest, Romania
US Army Corps of Engineer
• Wiesbaden, Germany. Ft. Belvoir Army Family Housing Community Development.
• Fort Stewart, Georgia, Savannah District. Mower Personnel Processing Center, Renovation of Building 208; Fort Stewart 5th BCT Infrastructure.
Residential Development
• Palazzo del Mare, Fisher Island, Florida
• Palazzo del Sol, Fisher Island, Florida




Assistant Engineer - ASR Construction, Fisher Island, Miami 2006-2007
• First US employment position as Assistant Engineer. Performed complex engineering tasks and particularly important engineering work efficiently and accurately. Extracted engineering information from CAD drawings. Prepared engineering computations, material quantity takeoffs for all divisions, estimates and studies, RFI, CO. Completed a variety of assignments such as drawings, specifications, and other materials suitable for procurement and construction purposes. Frequently interfaced with other Engineering disciplines for creating the schedule in assigned format (Primavera P3). Prepared detailed requisitions for equipment and materials. Reviewed supplier drawing submittals and performed technical bid analyses. Prepared and issued specifications, data sheets, and other construction documents.

Project Manager - CARPATI Buildings Corporation, Bucharest, Romania 1994 – 2005
• Directed construction for the Radiotherapy Clinic and other nuclear facilities at Elias University Hospital, a new specific building with underground nuclear protection of approx. 15,000 sq. ft. (material takeoffs and complete detail estimates for work site; subcontractor bids reviewed; prepare project schedule; safety management and document daily construction activities at the jobsite)
• Superintendent for Cantacuzino Hospital approx. 14,000 sq. ft. - Vaccines Ampoule Module
• Participated as assistant project manager to the construction of the M.I.S.R. Bank and conducted the indoor and outdoor trims and finishes for a two-level building of approx.10000 sq ft/level.
• Conducted the indoor and outdoor trim and finishes as assistant project manager for the B.R.D. Groupe Societe Generale Bank (one level, approx. 13,000 sq. ft.)
• Managed the construction proj...

Login or Register to view the full resume.