Talents: Building anything, having happy clients, and making money. High Energy VP of Operations, Senior Pre-Construction Manager or Senior Project Manager seeking an established and reputable General Contracting, Development, or Engineering Company that emphasizes their Design/Build Federal and large scale Commercial projects portfolio.
Summary:
Former “Vice President of Commercial Operations” for a $120M /year construction company. I am a seasoned leader of staff to include project managers, project engineers, estimators, schedulers, administrative, and clerical personnel. I have a great demeanor, lots of common sense, and believe in having fun in my endeavors while maintaining strict professionalism. I’ve started my career as a carpenter and have moved up the ranks after acquiring an engineering degree. My completed projects portfolio is rather extensive and includes a wide array of types and sizes running the gamit from Roller Compacted Concrete Dams, Power Plants, Prisons, Water Treatment Plants, Horizontal and Infrastructure, Aircraft Hangars, Car Dealerships, Heavy Fabrication, Class A Office, and Country Clubs. The majority of these projects have been in a Design / Build or Design / Assist Capacity where I have served as the Team Lead working with local and national Architects. The majority of these projects have received “Outstanding Performance” evaluations. This is a testament of the team which highlights my ability to coordinate and organize the team.
Solid skill-set working with Timberline Estimating, Timberline Project Management, Prolog, MS Office, Primavera P6, MS Project, ACAD 2009, Acrobat X, Revu Design, various Integrated time keeping and approval packages and familiarity with USACE QCS software.
Education and Training:
• University of Southern Colorado, Bachelor of Science – Civil engineering Technology
• Magna Cum Laude
• Associated General Contractors
• “Total Quality” Management Certified Gilbert/Commonwealth, Inc.
• 10-Hours OSHA Certified
• Familiar with USACE EM 385 1-1 Safety requirements
• 8-hour Lorman Stormwater certificate
• Certified USACE “CQC’ Construction Quality Management
• Extensive LEED OTC training
• Force Protection Level 1 Certified by NEK Advanced Securities Group
• CDOT Storm Water Certified Supervisor
• Manager, 3 LEED Gold Buildings and 2 Silver (Previous USGBC Corporate Contact)
Most Significant Professional Experience:
Harmon Bonded Plumbing and Heating, Inc. Sep 2012 – Present
Engineer. Performed Mechanical, Plumbing, and Electrical drawing conflict analysis using CAD backgrounds and REVU software to coordinate shop drawing production between the trades on two large Denver projects and the new Big Sandy K-12 school in Simla, CO
Bourne West Construction, Inc. Feb 2012 – Aug 2012
Rental Manager of Self Owned Mountain Property and relaxed for a summer
Native American Services Corporation Oct 2011-Feb 2012
Battle Command Training Center “BCTC”.
Project Manager. $30 million Fort Carson SIPR / NIPR net data distribution facility.
Federal Contracting dba Bryan Construction, Inc. 2001-2011
Colorado Springs, CO. Formerly VP of Preconstruction services and then VP of Commercial Operations. 10 year project listing follows:
OPBAT Hangar for United Stated Coast Guard. Great Inagua, Bahamas Sept 2010 – July 2011
Senior Project Manager. Design/Build team lead working with Architect to include building materials selection, technical write-up and proposal pricing. Awarded in March 2011($17.4 million). Completed negotiations and buy-out for construction, shipping and life support for on-site workers.
Lincoln Center Addition & Renovations – Fort Collins, CO Jun 2010 – July 2011
Senior Project Manager: Design/Assist Manager of an $8.4 million project which consists of a 18,800 s.f. renovation and 19,900 sf addition to the downtown performing fine arts building for the City of Fort Collins. This building achieved LEED Gold certification.
Lighting, Gas, & Pavement Repair -Peterson AFB, Colorado Springs, CO Jan 2010-Feb 2011
Project Manager. $4.4 million Design/Build project entailing the repair / replacement of high pressure gas line, various pavements, roads, aprons, and parking lots throughout Peterson AFB; an upgrade to Base Electrical Power phase VI: the removal of existing lighting bollards along Peterson East and installation of new exterior light poles in the same area.
Airfield Ops Repair-Peterson AFB, Colorado Springs, CO Jan. 2010-Jan.2011
Project Manager. Airfield Operations Design/Build upgrades. Construction of new force protection requirements, landscaping, and parking lots to include a permeable paver system and an in-laid 30’ diameter 8 point compass. Flight line tarmac improvements to include pavement replacement.
Aims Community College Automotive Technology Building-Greely, CO Mar 2009-Dec 2009
Senior Project Manager. $8.2 million Design/Build project that consisted of approximately 49,000 s.f. of service bays, new laboratories, offices, classrooms, circulation, and support spaces. LEED Certified upon completion.
Patriot Park Defense Complex -Colorado Springs, CO Jul 2005-Dec 2008
Senior Project Manager. $39.1 million, Design/Build construction of the following:
→ Scitor Building - 50,000 sf new Class ‘A’ office building included SCIF areas and additional high security clearance areas controlled with DoD standard systems. Patriot Park included a 65-acre phased site development, all interior arteries, utility mains stubbed into future lots, storm water retention area, and redevelopment of Sand Creek to include concrete drop structures and erosion control protection. LEED Silver Certified.
→ ITT Building 6 - 104,000 s.f. Design/Assist new Class ‘A’ office building on three floors. LEED Gold Certified, was the first LEED Gold in Colorado Springs, CO.
→ Building 7 - Approximately 90,000 s.f. Design/Assist Class ‘A’ office building on three floors. LEED Gold Certified
Springs Fabrication-Colorado Springs, CO Feb. 2008-Nov. 2008
Senior Project Manager for a $4.7 million Design/Build project which consisted of a 55,000 s.f. addition to the existing Springs Fabrication site. This new addition doubles the size of the existing structure and reached as high as 80 feet in some areas. Springs Fabrication is a BUTLER pre-engineered metal building with several impressive pieces of engineering inside the building itself, including two 40 ton bridge cranes that span the entire footprint of the building. This building also includes two 20 ton bridge cranes in the high bay, gantry cranes, leveling pads, a blasting bay, and several other features.
South Colorado Springs Nissan - Colorado...
Login or Register to view the full resume.