[Professional Experience]

Resident Researcher (dispatched by Tokyo Electric Power Company) Jul. 2012 – Present
Electric Power Research Institute (EPRI), Risk & Safety Management California, USA
• In charge of Fukushima accident analysis by EPRI’s severe accident code
• In charge of fire PRA, mainly on evaluating heat release rates for electric panel and on testing to evaluate zones of influence for fires that originate due to arcing faults in high-voltage equipment.
• Make presentations on Fukushima accident, severe accident analysis, and external event PRA at conferences, symposiums, universities, etc.
• Prepare for and attend technical visit from Japan to nuclear power stations, seminars and conferences.
• Survey and provide latest knowledge on important issues in the US such as fire protection, accident management, external event evaluations, regulator’s rule making activities, etc.

Senior Engineer Apr. 2008 – Jul. 2012
Tokyo Electric Power Company, Nuclear Asset Management Department Tokyo, Japan
• Conducted the seismic probabilistic safety assessment (PSA) including hazard assessment, fragility assessment, and event and fault tree analysis for nuclear power plants required by the Regulator. Negotiated with government and coordinated with Japanese utility companies in order to submit the final report of the evaluation to the Regulator.
• Conducted studies on safety assessment in case of external events such as earthquake, fire and flooding and aircraft impact while managing nuclear suppliers to lead the maximum result in a limited time.
• In charge of risk-informed safety management during plant outage for nuclear power stations. Introduced risk-monitor system and conducted modification of maintenance schedule during plant outage, based on the risk evaluation including deterministic and PSA, while coordinating with other departments inside company.
• In charge of PSA required in Periodic Safety Review (PSR).
• Supported the licensing of nuclear power station with taking charge of the accident analysis and the radiological consequence assessment on the safety review by the Regulator.
• Conducted collection and analysis of plant data, handled questions related to accident management and other safety issues, and wrote official technical documents released by company, for restoration work undertaken after the accident at the Fukushima Daiichi Nuclear Power Plant.
• In charge of radiological consequence assessment in case of disruption of water injection equipments for reactor pressure vessel and primary containment vessel after the Fukushima accident.
• In charge of external PSA for the Kashiwazaki-Kariwa Nuclear Power Plant.
• In charge of translating overseas technical documents from English to Japanese in order to increase knowledge and efficiency through benefiting from international experience.
• Organized the international nuclear conference ICAPP2009 (International Congress on Advances in Nuclear Power Plants).

[Other experience]

Exchange Researcher Apr. 2004 – Oct. 2004, May 2007 – Nov. 2007
Westinghouse Electric Company Connecticut/Pennsylvania, USA
Science and Technology Department
• Evaluated seismic safety for the advanced PWR, International Reactor Innovative and Secure (IRIS) plant, using the Probabilistic Risk Assessment (PRA) with CAFTA code to assess the ability of the design to the seismic event with being integrated with the design team.

Research Assistant May 2005 – Sept. 2005, Oct. 2006 – Mar. 2007
Tokyo Institute of Technology Tokyo, Japan
Department of Nuclear Engineering
• Course support for seminars and workshops.
• Directed co-evolutional research between nuclear technology and society.
• Organized the international nuclear conference INES-1 (Innovative Nuclear Energy Systems).

Internship Sept. 2005 – Dec. 2005
International Atomic Energy Agency Vienna, Austria
Department of Nuclear Safety and Security
• Researched contemporary state for methodologies of PSA for the Asian nuclear power plants.

Researcher Apr. 2005 – Sept. 2005
Japan Patent Office of Ministry of Economy, Trade and Industry Tokyo, Japan
• Researched technology for applications containing advanced technical contents and international applications in the field of nuclear engineering.
• In charge of part of patent examination procedures, such as drafting the notification informing of reasons for rejection of applications.

[Education]

Tokyo Institute of Technology Apr. 2005 – Mar. 2008
Graduate School of Science and Engineering Tokyo, Japan
PhD in Nuclear Engineering
• PhD dissertation: The first tool toward a risk-informed approach to the seismic design of the International Reactor Innovative and Secure (IRIS).

Tokyo Institute of Technology Oct. 2007 – Sept.2008
Graduate School of Innovation Management Tokyo, Japan
Master in Management of Technology
• Research project: The technology management strategy of Japanese nuclear suppliers according to ...