Randy

6/15/2014
Mount Jackson, VA

Position Desired

Quality Engineering
Anywhere in the U.S.
Yes

Resume

Randall L. Ruffner
292 Wunder St.
Mount Jackson, VA 22842
Home Phone (540) 477-2116
Cell Phone (540) 325-7900


Professional
Profile: Quality Engineer with local manufactures. Recent experience in Lean Six Sigma methods which resulted in waste reduction (time, people, material) with less spoilage and downtime. This was accomplished by “knowing the process” of manufacturing products to customer expectations.

Key Skills: Quality Planning Lead Time Reduction
Value Stream Mapping Failure Modes and Effects Analysis
Customer Kano Analysis Kaizen Projects
Root Cause Analysis 5S Projects
SPC Analysis DOE Analysis

Certifications: ASQ certified Quality Auditor
ASQ certified Quality Improvement Associate
Certified Six Sigma Green Belt through Six Sigma Specialists
Certified Six Sigma Black Belt through Six Sigma Specialists

Experience: Monoflo International Winchester, VA
Quality Engineer May 2009 to September 2012
Coordinating testing of manufactured plastic containers, bulk bins and trays. Updating quality procedures for all plastic products manufactured. Developing quality plans for new products. Insuring ISO 9001-2008 standards are maintained. Supervised four quality auditors. Worked on Kaizen projects for improving sample process plans, standard work procedures. Also coordinated 5S projects in Lean Training.
ISO 9001:2008 Requirements from A to Z course-March 2010

Crown Cork & Seal, Inc. Winchester, VA
Production Supervisor July 2006 to September 2008
Supervising skilled and non-skilled employees during a Lean Manufacturing management transition. Effectively using Smartline software to eliminate downtime. Overseeing Storeroom Kaizen event which overhauled the storeroom using E-Maintenance software.
Quality Assurance Engineer October 2004 to June 2006
Insure process control through current quality methods of six sigma.


Randall L. Ruffner
SPC Supervisor September 1999 to October 2004
Oversee and manage statistical process control throughout the end manufacturing process. Oversee and manage the (LAN) network at the Winchester plant. Oversee and manage the NWA software for process control, data, and charting. Overseeing Corrective Action Teams, and performing machine capability studies.
Network Engineer LFCC May 2002
Internetworking Engineer LFCC May 2003
Production Supervisor December 1989 to September 1999
Supervising employees in packaging and handling aluminum beverage lids and aluminum spoilage. Active member of the SPC Implementation Team, which is moving our production process from product appraisal cost of conformance to product prevention cost of conformance.

V...

Login or Register to view the full resume.