Aslam

6/25/2014
Chicago, IL

Position Desired

Construction Engineering
Anywhere in the U.S.
Yes

Resume

CAREER OBJECTIVE

To serve an esteemed organization, which can provide me with the opportunity to contribute and employ my skills and abilities to offer professional growth while being resourceful, innovative, and flexible.

PERSONAL SKILLS

• Comprehensive problem solving abilities, excellent verbal and written communication skills and willingness to learn
• Accomplished time management skills in addition to team building capabilities and adaptability to different cultures
• Ability to take on multiple assignments and learn quickly
• Excellent Team Member
• Exceptional ability to work independently

TECHNOLOGY SKILLS

• OPERATING SYSTEMS: MS-DOS, WINDOWS 98/2000/Xp/Vista/Win8
• LANGUAGES: C, C++, Java, Ladder Graphics Programming, Functional Block Diagram
• PACKAGES: MS-OFFICE, AUTOCAD
• APPLICATION SOFTWARE: KEIL SOFTWARE, SPICE, RS LOGIX 500, LOGO! SOFT COMFORT, RS VIEW, AUTOCAL Calibration

EDUCATION

• Jawaharlal Nehru Technological University, Bachelor of Technology in Electrical and Electronics Engineering. Andhra Pradesh, India. December 4, 2006. GPA: 3.75 (According to Educational Credential Evaluators, Inc.) Graduated First Class with Distinction.

ACADEMIC PROJECT DETAILS

PROJECT: “SMS BASED MACHINE CONTROL SYSTEM”
CUSTOMER: Galaxie Software Solutions Pvt Ltd.
DURATION: DEC 2005 TO MARCH 2006.
DESCRIPTION: The aim of the project is to control remotely placed machines by sending a short messages or command words via wireless serial communication through PC or Cell phone. This was an innovative project work done in the field of Micro-controller and Pc. Micro controller is used at the receiver side and the Pc at transmitter end. Serial data communication is used to route the data from PC to Micro controller side. Micro controller is programmed in C language by use of KEIL simulation software and later converted into hexadecimal code and then dumped directly into AT89C51 micro controller. This project was designed to monitor switching states of all connected machines with a control to perform switching action ON/OFF.

CERTIFIED COURSES

• Internal Audit Training Course to ISO/IEC 17025:2005 (General Requirements for the Competence of Testing and Calibration Laboratories) from Dubai Accreditation Department, United Arab Emirates. (April 2013)
• PLC Programming and Application from Advance Training Institute for Electronic and Process Instrumentation (ATI-EPI), Ramantapur, Hyderabad. (July 10-21, 2006)
• Automation using micro PLC (SIEMENS LOGO) from Advance Training Institute for Electronic and Process Instrumentation (ATI-EPI), Ramantapur, Hyderabad. (Aug. 7-11, 2006)
• SCADA Programming and Application from Advance Training Institute for Electronic and Process Instrumentation (ATI-EPI), Ramantapur, Hyderabad. (Sept. 11-15, 2006)

WORK EXPERIENCE

• Electrical, Instrumentation, and Calibration Engineer: Fugro-Suhaimi Ltd: Dammam, Saudi Arabia, February 2007-June 2013
o Performing calibration of mechanical/electrical/instrumentation instruments in the laboratory and in the field. Also calibrate asphalt and concrete batch plants and perform loop checking. Maintaining all quality records, perform / supervise field calibration of petrochemical plants. Managing all the operation of a calibration laboratory in Fugro-Suhaimi Ltd. including, as appropriate, setting technical and operating standards/procedures, submitting proposals, managing contracts, managing and sourcing calibration technicians over project sites.

• Construction Field: Various Plants in the Kingdom of Saudi Arabia. More than 6 years of experience in Construction field in the Kingdom of Saudi Arabia. Worked on Various Projects related to Calibration, Loop Checking, Commissioning and operation of various plants, which includes Saudi Aramco, Sabic, Saudi Electricity Company, Jubail Chemical Industries Company.

• Leading Commissioning Engineer: Qurrayah Power Plant, Qurrayah, Kingdom of Saudi Arabia. (December 2009 to May 2011)
--Combined Cycle Power Plant QCCPP-II for more than one and half year during energizing of accessory modules for Gas Turbines which includes Absolute Gas Filter Separators, Gas Scrubber, Atomizing Air Compartment, Gas Fuel and Liquid Fuel S...

Login or Register to view the full resume.