Engineering Professional
Professional with experience in support of product Manufacturing and new Product Introduction.
Excellent troubleshooting skills at the system and component levels as well as system build.
Proven leadership and capability of leading a group of support technicians across 3 shifts.
Excellent communication skills and flexibility to achieve interdepartmental projects.
PROFESSIONAL EXPERIENCE
10/2010 Northeast Utilities PSNH, Manchester NH
To
Present
Database Analyst
Build Databases to support Substation and Line Maintenance Create new records, make additions and improve the databases syntax and format Issue maintenance and repair schedules to supervisors and responsible personnel
04/2007 Northeast Utilities PSNH, Manchester NH
To
04/2009
Test Engineer
Support substation construction projects. Develop requirements, Update all Project Schematics, scope and needs.
Help prepare cost estimates, schedules. Evaluate work plans and coordinate personnel required to support assignment. Procure all equipment and material necessary through direct purchase or bidding process. Organize whole engineering project and follow it through completion
9/09/2004 BROOKS AUTOMATION CORP.
to
9/09/2006
Manufacturing and test engineer (RMA)
Evaluation and analysis of wafer handling robotic systems.
Performed electrical and physical analysis of defective products.
Worked as part of a collaborative multidisciplined team to identify
Root cause and corrective action.
Use of diagnostics equipment and software tools to perform above tasks.
09/2001 C-PORT CORPORATION,A Division of Motorola
To
09/2004
Manufacturing and test engineer
Electrical test and characterization of a family of network processors
using a Teradyne 973 ATE and bench top set ups.
Analyse,evaluate and chart results in a comprehensible report.
Resolved issues with fab. Houses (in West Cost) involving
mechanical, electrical and test software problems, remotely
as well as occasional travel to sites.
Full implementation of a laser machine vision inspection process for the
scanning of mechanical parameters of Ball Grid Array (BGA) packages.
Assumed all responsibilities on above system including
software, hardware, calibration and repairs.
Also created applications for new packages and JEDEC carrying trays.
09/2000 AGILENT TECHNOLOGIES
To
06/2001
Manufacturing engineer
Manufacturing support for medical equipement products.
Identify test failures at system and board level and apply corrective
Measures.
Implement software changes and drive hardware changes for latest
Product releases.
11/1988 VICOR CORPORATION. (Power supply manufacturing)
To
03/...