Ajinkya

8/9/2014
Victoria, TX

Position Desired

Manufacturing Engineering
Anywhere in the U.S.
Yes

Resume

Ajinkya A. Bandbe


CAREER PROFILE:

Master of Science - Industrial Engineering specialized in Manufacturing and Supply chain with over 3 years of professional experience and expertise in Continuous Process Improvement Techniques, Lean Manufacturing (Standard Work & 5S), Facility & Process Planning, Six Sigma Methodologies, Inventory Control, Supplier Evaluation & Management, Negotiation, Execution and Team Center.

PROFESIONAL EXPERIENCE:

• Caterpillar, Inc:- Manufacturing Engineer Aug 2011- Present

 Six Sigma.
Was an integral part of the Rapid Improvement Workshop team, which worked with the goal of identifying and implementing process improvements all over the facility that resulted in reducing Cycle times for all zones under takt time by an average of 9% and overall throughput has improved by 53%.

 Manufacturing Line Support:
Worked on the main assembly line providing support to the operations worker in getting them the required tools, making them understand the 2D/3D drawings and made sure everyone is working Safe.

 Supply Chain Management:
Identification, development, negotiation and management of existing and further development of mechanical suppliers. Purchased lifting devices like Jib cranes, chains, straps, Hooks etc.

 Supplier Quality Engineer:
Oversee, direct and continually improve the activities of Supplier Quality as received at the plant. Lead the investigation and containment activities associated with Supplier Nonconformance issues. Cross-functional support between engineering design, operations and manufacturing in-order to fix the issue.

 Facility Design/ Process Design.
Drafting and designing layout of equipment, materials, and workspace to illustrate maximum effectiveness using drafting tools and computer with a high level of employee involvement.

 Continuous Improvement: (CI cards)
Asked feedbacks form the line operator from time to time, and after investigating on the responses implemented the necessary changes.

 Standard Work:
Implemented Standard work all over the facility by analyzing the current process then doing Time study and with the help of TEAMCENTER Vis Mockup.

 5S.
Identifying cost-saving opportunities, such as Sorting/standardization of raw materials, eliminating non-value adding activities and driving process changes to improve quality.

 Planned Material Movement.
Made sure the material reaches on time through the shortest but safest path.

• University of Texas at Arlington:- Lab Assistant (Inventory) Feb 2010 – May 2011
a. Inventory Management (Books, Video tapes, cassettes, DVD, hardware, Stationary materials, etc).
b. Vendor selection and Purchasing.

• Tata Institute of Fundamental Research, India. – Project Engineer. Aug 2008 – April 2009
a. Headed a team of 2 Designers and 2 CNC operators.
b. Designed a Vacuum Chamber in Auto cad, PRO-e and had analyzed in IDEAS.

• Kamat Paints, India. – Engineering Intern Jun 2008 – Aug 2008
a. Material Requirement Planning, Vendor selection, Purchasing and Logistics.
b. By working closely with the supplier we were successful in reducing per unit cost by 29% as well as consistent on time delivery.
EDUCATION:

• Master of Science: Industrial Engineering (GPA 3.5...

Login or Register to view the full resume.