Objective
Obtain a manufacturing engineering, project management, or similar position within a progressive organization where strong problem solving, project management, analytic, and organizational skills may be utilized.

Qualifications
 15+ years experience in manufacturing to include various facets of manufacturing planning, manufacturing estimating, manufacturing engineering, industrial engineering, and project management
 15+ years experience in the research and interpretation of engineering drawings, engineering specifications, process specifications, government specifications, industry specifications, purchase order requirements, etc.
 15+ years experience in various manufacturing environments including large component integration, detail part manufacturing, process engineering, composite manufacturing, machine shop manufacturing, sheet metal assembly, etc.
 10+ years experience in the methodologies of Lean Manufacturing, Kaizen, Six Sigma, DMAIC, Design for Six Sigma, Continuous Improvement, etc.
 15+ years experience in the design, development, and administration of MS Access databases (including SQL and VBA code writing), MS Excel spreadsheets (including VBA code writing), MS Project
 15+ years experience in the use of various MRP/ERP systems including CAS, INFISY, DCD Classic, DCD Vantage, SAP, MES and PIOS
 Various levels of experience with other software packages, operating and engineering platforms including MINITAB, MS PowerPoint, MS Outlook, Lotus Notes, Dreamweaver, AutoCAD, CATIA (V5), ENOVIA, DELMIA, 3DVIA, etc.

Relevant Experience
Bombardier-Learjet, Wichita, Kansas – Team Lead, Processes & Tooling 04/2010 – present
 Managed a team of 14 Manufacturing Engineers and Industrial Engineers responsible for the development and maintenance of Methods/Operations department business processes and Final Assembly Line assembly, transportation and conveyance tooling
 Appointed site focal for the integration of SAP, for system development and for business requirement definition
 Led the conformity/configuration control efforts of major structural assemblies manufactured in Mexico
 Managed the life-cycle development of softwares utilized to provide visibility of shop-floor build status, safety-related information, part shortage information, engineering release status, engineering backlog status, et. al.

Global Aeronautica, Charleston, South Carolina – Contract Manufacturing Engineer 07/2009 – 04/2010
 Provided liaison engineering support to production floor personnel for matters pertaining to assembly and integration plan revision, correction, explanation, and verification
 Assisted in the design, implementation and maintenance of a Work Authorization Request database to authorize and track changes to manufacturing integration plans

Cessna Aircraft, Wichita, Kansas – Manufacturing Engineer 04/2008 – 07/2009
 Coordinated the procurement and scheduling of all electrical/electronic purchased parts for experimental engineering department on development program
 Designed, implemented and maintained PCB/ESD Lab Component Database to forecast requirements for and track usage of PCB components for development and legacy programs
 Developed production planning to incorporate requirements of new engineering on development program
 Served as Experimental Department liaison in matters pertaining to the scheduling and build of 40+ ground test articles and 4 pre-production flight articles
 Appointed Subject Matter Expert and Business Process Analyst for SAP integration projects

Bombardier-Learjet, Wichita, Kansas - Methods Engineer 07/2000 – 04/2008
 Served as Operations Department representative on Learjet’s Change Integration and Change Coordination Teams to assess cost, tooling, build and schedule impact of engineering change
 Provided engineering liaison support to electrical wireshop and shop floor for matters pertaining to electrical harness build up, installation, and functional testing
 Designed, built, and maintained engineering configuration of wireharness layout boards for 8 major wireharnesses as well as patch/subassembly harnesses
 Harmonized the final line engineering change integration strategies of 42 external partners headquartered throughout the world
 Oversaw process control and database management of Learjet’s Request for Engineering Change Process, Technical Review and Implementation Board, Methods Engineering Backlog, Production Management Database et. al.
 Provide weekly, monthly, and semi-annual metrics reporting of Methods Department activities and Production Department activities to all organizational levels
 Assist in the investigation, development, and continuous improvement of workflow strategies, plant layouts, ergonomic developments, manpower re...