Summary of Experience
Over 14 years of progressive professional experience in the creation, manipulation, testing, and implementation of geospatial products and projects. This experience includes:
•Creation of GIS data from start to finish
•Maintaining GIS data including manipulation and editing
•Data conversion and capturing
•Test procedure development for ArcGIS tools
•Field work using GPS equipment and documentation of criteria
•Custom map creation
•Managing newly created geodatabases
•GIS/exploitation systems software integration
•Experience with IV&V, writing customer system level RVLs and configuration checklists
•Conducting RVL/checklist execution
•Supporting User Interaction Periods directly with Customer Users and Management
•Experience in photogrammetric production – stereo image production and ortho photo production
Experience
Raytheon Systems Company, November 2003 – January 2014
Systems Engineer 2
Duties and Accomplishments
•DOD Top Secret Clearance with a SSBI date of 03/22/2010
As a Cyber Security Engineer:
•Developed security test cases for program infrastructure
•Submitted security documentation to certification agencies (software approvals, test plans, SRTM)
•Validated hardening and security posture for infrastructure system
•Performed Certification and Accreditation testing on multiple systems to meet DCID 6/3 requirements
As a Systems Engineer:
•Used ArcGIS to conduct Feature Extraction for test validation
•Put together test procedures to test prototype GIS environments
•Used ERDAS Imagine and Socet Set for imagery manipulation and mosaic
•Created workflows for prototype environment
•Developed test environments using ArcSDE
•Wrote and executed RVLs and checklists to selloff customer requirements
•Integrated GIS/exploitation systems at customer site
•Built relationships with Vendors, Customer Users, and Customer Management
•Involved in User Interaction Periods to allow the end user to test the system before requirements selloff
•Involved directly in trade study with the customer
•Managed $2M Earned Value (EV) Bill of Materials for COTS integration program
•EV tracked at BOM line item level
•Worked with vendors and supply chain to generate procurement requests and ensured accuracy and tracked material through procurement cycle status management and update EV metrics
City of Fort Worth, Fort Worth, June 2002 – November 2003
Engineering Technician 1
Duties and Accomplishments
•Used ArcGIS to digitize and attribute water and sewer lines using GPS points and As-Built Plans
•Reading and interpreting As-Built Plans for the City of Fort Worth
•Team member for ArcSDE geodatabase maintenance to store and view current water and sewer line geospatial data
•Utilized Bentley Microstation for use in digitizing water and sewer lines
Freese and Nichols Fort Worth, April 2002
GIS Contractor
Duties and Accomplishments
•Used ArcGIS to digitize and attribute water and sewer lines using GPS points and As-Built Plans
•Reading and interpreting As-Built Plans for the City of Flower Mound
Carter and Burgess Inc, March 1999 – February 2002
GIS Specialist 1
Duties and Accomplishments
•Performed manhole recon analysis for preliminary route development of sewer systems. This included taking manhole depths, GPS, sewer flow and direction. Documented manhole criteria with photographs. Incorporated all dimensions into ArcGIS maps for client and city requirements.
•Developed GIS implementation support services. This included population and edited parcel data, used AutoCAD files to extract layers and made into coverages, create geocoded and georeferenced GIS data, digitizing water and sewer lines flow direction implementation using ESRI’s ARCINFO, and map creation.
•Using ArcView, provided GIS support in the form of map creation for proposed airport and a major roadway at former US military installation.
•Using ArcView, provided GIS support for programmatic environmental assessment of proposed development. This included coverage editing and map production.
•Used ESRI software to extract road layers from CAD files for use in a decision support system. Images were posted on web site for ease of communications between CDOT personnel and their contractors.
•Performed inventory, evaluation and space audit for Bureau of Indian Affairs Condition Assessment Service. The program included identification of existing facilities, infrastructure, and rolling sto...
Login or Register to view the full resume.