SKILLS AND QUALIFICATIONS
* Diverse process engineering, project engineering, and project management experience in facility design, testing, start-up, operations, deactivation, and demolition.
* Extensive experience in technical document and operating procedure writing.
* Strong background in hands-on facility walk-downs, maintenance, and work package planning.
* Expertise in regulatory environment, including Department of Transportation (DOT) and Nuclear Regulatory Commission (NRC) transportation regulations.
* Team-building interpersonal skills with co-workers, support groups, operations/crafts, and management.
* Excellent computer skills, including Microsoft Excel, Word, PowerPoint and some CAD.
* Proficient written and verbal communication skills.
WORK EXPERIENCE
Principal Engineer, March 2012 – present
AEM Consulting, LLC, Richland, Washington
Process engineer for a variety of engineering studies and design projects:
* Prepare material balances, process flow diagrams (PFD), piping and instrumentation diagrams (P&ID), and equipment sizing calculations.
* Some CAD drawing development.
* Prepare process descriptions and alternatives analysis for technical reports.
Senior Engineer/Planner, March 2009 – January 2012
Washington Closure Hanford, LLC, Richland, Washington
Dual role as facility demolition engineer and planner:
* Developed strategies for facility demolition preparation and execution.
* Authored hoisting and rigging evaluations and calculations.
* Performed walkdowns to formulate facility sketches and schematics.
* Prepared work packages and conducted associated hazard analysis meetings for field work.
* AHERA project designer for asbestos abatement work.
* Key contributor for demolition of significant plutonium-contaminated building.
Project/Process Engineer, November 1998 – September 2008
EnergySolutions Federal Services, Inc. / Duratek Federal Services, Inc., Richland, Washington
Design lead for design, testing, and fabrication of sampling equipment for underwater radioactive sludge (1 year):
* Coordinated review and issuance of design documents.
* Prepared design change notices to resolve issues during equipment fabrication and installation.
* Maintained schedule for weekly progress reporting.
Project engineer for radioactive material transportation (6 years):
* Developed cost estimates, schedules, and proposals based on client requests.
* Provided oversight to analysts in various disciplines (mechanical, structural, thermal, and nuclear).
* Prepared and revised transportation safety basis documents, including compilation of analysis by others.
* Managed work progress and tracked costs to ensure project completion on time and under budget.
Process design engineer for pneumatic conveying and slurry handling tank systems for a radioactive waste vitrification plant (3 years):
* Prepared process flow diagrams (PFD), piping & instrumentation diagrams (P&ID), system descriptions, equipment sizing calculations, and process datasheets.
* Worked closely with piping engi...
Login or Register to view the full resume.