St. Louis, MO
Seeking Assignments in Instrumentation & Control system
SYNOPSIS
B.E. (Inst.& Control Engineering) with 8+ years of experience in Instrumentation, control & automation engineering and design & development of plant control systems.
Associated with L&T LTD., Vadodara as an Assistant Manager (PC&IS Department).
Finalizing Design requirements and specifications in consultation with clients, external suppliers, contractors & vendors; exposure in managing technically advanced state of the art production systems and project.
Effective communicator & negotiator with strong analytical, problem solving & organizational abilities.
Skilled in Control sytem designing for the Plant, Selection and sizing of the nstruments,PLC/SCADA/HMI Programming.
Well conversant with NEC , IEC standards
Authorization to work in the United States on a full time basis , holding H1B visa
ORGANISATIONAL SCAN
1). Yantra Automation Pvt. Ltd.,Vadodara (From June - 2006 to October - 2008) As Project engineer, Automation department.
Project Done:
• Offline & Online blending system Of SRD Nutrient Pvt. Ltd Assam.
• CO2 recovery Plant of India Glycols Ltd. Kashipur
• 5-Axis Horizontal Flow wrapper high speed seal packaging M/C of Uniwrape Systems Pvt.
Ltd. Baroda
• RO+EDI+UV Plant of Ranbaxy Pharmaceutical, Dewas, M.P.
• Water treatment Plant of Nerul sugar, Mumbai.
• RO+EDI+UV+MGF Plant of Virchow biotech,Pune
• Pipe Cutting Machine Jain irrigation System Pvt. Ltd, Jalgowen,Maharastra
Key Deliverables:
Development of PLC program as well as SCADA screen as per the client requirement with
Installation & Commissioning of panel and instruments.
Troubleshooting & modification in plc programm.
Communication of PLC, SCADA station & HMIs through DH485/Ethernet/Device net/Control net.
Development of SERVO application through the communication between PLC and SERVO DRIVE.
2). Videocon Industries Ltd.,Bharuch (From October - 2008 to September - 2010) As Maintanance engineer, P/E Instrument department.
Key Deliverables:
To read and interrupt electrical circuits, PLC logic as well as P&ID loops and modify them as
per process requirement.
Installation & Commissioning of complete 2 M/Cs line for finished glass with PLC/SCADA Programming with Controllogix.
Planned preventive corrective & breakdown maintenance of PLCs, MCC panels & feeders, Drives, as per ISO rules & regulation and involved in KAIZEN related work of finishing area.
Program Modification & Touch-Up of GE FANUC & ABB robots.
Troubleshooting of AB [PLC5, MICROLOGIX, SLC, and ControlLogix] & SIEMENS (S7 & S5) PLCs used in finishing area.
Development of SCADA system (winCC, RSView32, and FTView ME/SE) to monitor the finishing lines.
3). Larson & toubro limited, Vadodara (September-2010 to present) As an Assistant manager
Project Done (Onsite lead Engineer @ Procter & Gamble Mfg Plant Baddi HP,India from November-2010 to September-2012)
• CIP2.3 (Nobs-Perborate, Clay dosing, W-Shape Soda silo & Dense phase conveying system)
• Anti Bact Perfume & RV Base Isotainer Liquid systems
• CIP3.0 (Paddle mixer, Liquid-RV/NI/LB/HLAS system)
• Capacity Increasing Project
Key Deliverables:
Testing, Troubleshooting, Implementation & Debugging of PLC Programs, Development, & Modification of PLC, SCADA & HMI Programming.
Installation & Commissioning of powder/Liquid handling area with the PLC/SCADA Programming (Clay Dosing System,Nobes & Perborate, Dense Phase Conveying System,RV Isotainer)
Selection of field Instruments as per the plant requirement, Selection of PLC Hardware for Expansion Projects.
Engineering Information Package Preparation & Review.
Review P&ID; Make the Process Flow Diagram (PFD), and Prepare I/O List, Instrument List & Instrument Data sheet.
Prepare Control & Power Cable Schedule, MEDL, BOQ, Verify Vendor Quotes for Technical Correctness, Prepare IQ/OQ Check List, Prepare Control System Architecture & User Requirement Document
PLC/VFD panel design, Wiring, Installation & Commissioning
MCC/PCC Panel Design & Detailing.
To provide Hardware & Software Training on PLC, SCADA & HMI to The Technicians & Operators.
Prepare The Shutdown Execution Plan For New Projects.
Worked with Equipment Editor, Recipe Editor & Batch View as a part of the factory talk batch.
Maintaining the Electrical master plan for whole F&HC plant.
Project Done (Offshore lead Engineer @ Vadodara from september-2012 to October-2013).
• Fusion Packing Line#1,2,3,4,5 & 6.
• Zing Packing and Making.
Key Deliverables:
Ossshore Man hour Estimation based of the Document of understanding provided by Client.
Kick-off meeting with onsite counterpart in the starting phase of project to understand the scope of work.
Resource planning according to the capability.
Maintaining the flow of deliverables based on Inputs received from onsite
Interdisciplinary and onsite co-ordination
Daily and weekly ca...
Login or Register to view the full resume.