Ravi

12/28/2014
St. Louis, MO

Position Desired

Other Engineering
Anywhere in the U.S.
Yes

Resume

Seeking Assignments in Instrumentation & Control system

SYNOPSIS
B.E. (Inst.& Control Engineering) with 8+ years of experience in Instrumentation, control & automation engineering and design & development of plant control systems.

Associated with L&T LTD., Vadodara as an Assistant Manager (PC&IS Department).
 Finalizing Design requirements and specifications in consultation with clients, external suppliers, contractors & vendors; exposure in managing technically advanced state of the art production systems and project.
 Effective communicator & negotiator with strong analytical, problem solving & organizational abilities.
 Skilled in Control sytem designing for the Plant, Selection and sizing of the nstruments,PLC/SCADA/HMI Programming.
 Well conversant with NEC , IEC standards
 Authorization to work in the United States on a full time basis , holding H1B visa

ORGANISATIONAL SCAN
1). Yantra Automation Pvt. Ltd.,Vadodara (From June - 2006 to October - 2008) As Project engineer, Automation department.

Project Done:
• Offline & Online blending system Of SRD Nutrient Pvt. Ltd Assam.
• CO2 recovery Plant of India Glycols Ltd. Kashipur
• 5-Axis Horizontal Flow wrapper high speed seal packaging M/C of Uniwrape Systems Pvt.
Ltd. Baroda
• RO+EDI+UV Plant of Ranbaxy Pharmaceutical, Dewas, M.P.
• Water treatment Plant of Nerul sugar, Mumbai.
• RO+EDI+UV+MGF Plant of Virchow biotech,Pune
• Pipe Cutting Machine Jain irrigation System Pvt. Ltd, Jalgowen,Maharastra

Key Deliverables:
 Development of PLC program as well as SCADA screen as per the client requirement with
Installation & Commissioning of panel and instruments.
 Troubleshooting & modification in plc programm.
 Communication of PLC, SCADA station & HMIs through DH485/Ethernet/Device net/Control net.
 Development of SERVO application through the communication between PLC and SERVO DRIVE.

2). Videocon Industries Ltd.,Bharuch (From October - 2008 to September - 2010) As Maintanance engineer, P/E Instrument department.

Key Deliverables:
 To read and interrupt electrical circuits, PLC logic as well as P&ID loops and modify them as
per process requirement.
 Installation & Commissioning of complete 2 M/Cs line for finished glass with PLC/SCADA Programming with Controllogix.
 Planned preventive corrective & breakdown maintenance of PLCs, MCC panels & feeders, Drives, as per ISO rules & regulation and involved in KAIZEN related work of finishing area.
 Program Modification & Touch-Up of GE FANUC & ABB robots.
 Troubleshooting of AB [PLC5, MICROLOGIX, SLC, and ControlLogix] & SIEMENS (S7 & S5) PLCs used in finishing area.
 Development of SCADA system (winCC, RSView32, and FTView ME/SE) to monitor the finishing lines.
3). Larson & toubro limited, Vadodara (September-2010 to present) As an Assistant manager

 Project Done (Onsite lead Engineer @ Procter & Gamble Mfg Plant Baddi HP,India from November-2010 to September-2012)

• CIP2.3 (Nobs-Perborate, Clay dosing, W-Shape Soda silo & Dense phase conveying system)
• Anti Bact Perfume & RV Base Isotainer Liquid systems
• CIP3.0 (Paddle mixer, Liquid-RV/NI/LB/HLAS system)
• Capacity Increasing Project

Key Deliverables:
 Testing, Troubleshooting, Implementation & Debugging of PLC Programs, Development, & Modification of PLC, SCADA & HMI Programming.
 Installation & Commissioning of powder/Liquid handling area with the PLC/SCADA Programming (Clay Dosing System,Nobes & Perborate, Dense Phase Conveying System,RV Isotainer)
 Selection of field Instruments as per the plant requirement, Selection of PLC Hardware for Expansion Projects.
 Engineering Information Package Preparation & Review.
 Review P&ID; Make the Process Flow Diagram (PFD), and Prepare I/O List, Instrument List & Instrument Data sheet.
 Prepare Control & Power Cable Schedule, MEDL, BOQ, Verify Vendor Quotes for Technical Correctness, Prepare IQ/OQ Check List, Prepare Control System Architecture & User Requirement Document
 PLC/VFD panel design, Wiring, Installation & Commissioning
 MCC/PCC Panel Design & Detailing.
 To provide Hardware & Software Training on PLC, SCADA & HMI to The Technicians & Operators.
 Prepare The Shutdown Execution Plan For New Projects.
 Worked with Equipment Editor, Recipe Editor & Batch View as a part of the factory talk batch.
 Maintaining the Electrical master plan for whole F&HC plant.

 Project Done (Offshore lead Engineer @ Vadodara from september-2012 to October-2013).

• Fusion Packing Line#1,2,3,4,5 & 6.
• Zing Packing and Making.

Key Deliverables:
 Ossshore Man hour Estimation based of the Document of understanding provided by Client.
 Kick-off meeting with onsite counterpart in the starting phase of project to understand the scope of work.
 Resource planning according to the capability.
 Maintaining the flow of deliverables based on Inputs received from onsite
 Interdisciplinary and onsite co-ordination
 Daily and weekly ca...

Login or Register to view the full resume.