Harold B

1/28/2015
San Juan, PR

Position Desired

Industrial Engineering
Anywhere in the U.S.
Yes

Resume

Experience

Process Engineer May 2014 to December 2014
Lutron SM Humacao, Puerto Rico
•Supervise Surface Mounting Technology Department that consist of four Department Leaders.
•SMT Process Owner for documentation and SOPs.
•SMT Production Run Memos for new products or changes in design of products.
•Process improvement leader to improve 10% of OEE in SMT Area.
•Coordination of Preventive Maintenance in SMT
•Quality Assurance Owner of products in SMT area.
•Feeder Maintenance Project Owner.
•Daily Reports of SMT Manufacturing Root Cause Analysis and Corrective Actions to guarantee production metrics.
•Downtime Report and Changeover process data stratification and analysis.

Technical Services Engineering Coop March 2013 to May 2014
GE Energy Management Arecibo, Puerto Rico
•Validation of new materials to implement and reduce 3% of material costs per unit.
•Responsible of performing Gage R&R’s in all testing equipment of Quality Department.
•Performing warehouse audits to maintain a 94% of Material Accuracy.

Process Engineering Department COOP September 2012 to March 2013
Destileria Serralles Ponce, Puerto Rico
•Warehouse capacity analysis development and layout design for improving space requirements and reducing costs, calculation of finished goods inventory turnover.
•Forecast sales quota for sales department and budget calculation.
•Time studies to standardize and improve process of customer returns.

Field Technician May 2007 to May 2009
GLM Engineering San Juan, Puerto Rico
•Field Brigade team member for Unaccounted-for Water Project.
•Performed leak detection surveys, water accountability, N-1 and N-3 system closure tests with the purpose of estimating amount and location of major water losses.


Education
Bachelor in Sciences, Industrial Engineering Major Completed February 2014
Polytechnic University of Puerto Rico. Magna Cum Laude, 3.61 GPA, Industrial Engineering Honor Student.


Projects
•Janssen Ortho, Reduction of Changeover Time in IR Coaters, total estimated savings of $125k upon 1 year of implementation...

Login or Register to view the full resume.