Qing

5/21/2015
Houston, TX

Position Desired

Structural Engineering
Anywhere in the U.S.
Yes

Resume

Qing

Summary
Years of Experience
20+
Industries
• Oil and Gas, Offshore/Onshore Structure
Types of Facilities
• Jackets/Pile
• Fixed Topside Platform
• Deep-water Topsides Floating Production/FPSO/Semi-submersible
• Jack-up Leg, Spudcan & Hull
• LNG’s

Areas of Expertise
• Jack-up/hull Global and Local Finite Element Analysis (SACS & ANSYS)
• Primary Steel Design of Topsides & Jackets/pile
• Secondary and Tertiary Steel Design of Topsides
• Engineering Design and Analysis for Offshore/Onshore Projects
• Marine Engineering Analysis & Design for Loadout, Transportation, seafastening and Installation
• Certificate Verification Approve (CVA) & Marine Warranty Service (MWS)
• Shipyard General Engineering, Technical Support
• Familiar with design codes, criteria and procedures, such as DNV, ABS, API, BV, AISC, AWS, Noble Denton Guidelines & ND/Heerema Technical Procedures
• Structural Interface Management.


Qualifications
Education
Bachelor’s Degree, Civil/Structural Engineering, Tianjin University – China (1983-1987)
Registrations / Certifications / Licenses
SNAME member 2005-2009 (The Society of Naval Architects & Marine Engineers)
Program Training Certifications (SACS, ANSYS)

Software / Skills
• SACS
• StruCAD
• ANSYS
• AutoCAD
• STIPLA-DNVRP
• Toolkit NET
• MathCad
• PDMS
• JUSTAS
• SAP2000
• Staad Pro
Languages
• English
• Chinese

Status
China Citizen + Permanent Resident of US (green card)
Experience
Experience includes structural design, fabrication support, design representative, all design phase including feasibility study, basic design, detail design, shop design and upgrade design for offshore structures, including Floating topsides structures, jackets and topside structure, drilling rig Jack-ups leg and hull structure, structural interface management, transport grillage and sea-fastening design, Certificate and Verification of Agency (CVA) analysis, Marine Warranty engineering review and approval.
Professional History
Wood Group Mustang (Oct 2012 – Mar 2015) Senior Principal Structural Engineer
• Hou Spt Ivar Aasen
M50 SST & TST design and analysis for inplace/blast/transportation/lift etc, M50/M00 integration, lift, loadout and transportation analysis.
• MSP Follow on (WGM-DSME)
Follow on Engineering, primary steel design and analysis for jacket and topside, module integration analysis, boat landing installation analysis.
• Mafumeira Sul (MSP-DSME)
Detail Design of primary steel topside / access platforms, transportation analysis, jacket on-bottom stability/pile calculation, crane pedestal/boom rest design and analysis, joint connection calculations, review work.
AMEC Oil & Gas ( April 2010 – Oct 2012 ) Senior Structural Engineer
• Mad Dog Phase II (Spar) topsides structural engineering
1) Case Study and Select Phase: inplace, lift, loadout, transportation analyses, detailed analytical work of structural framing, load application and member sizing; Combined analysis; performed conversion of SACS models to PDMS; using AutoCAD, detailed loadout and transportation arrangement by trailer/skid shoe options; detailed assessment for transport force, tubular axial force and bend moment code check etc; detailed clash check; crane pedestal detail design for static and fatigue as per API 2C code, crane boom rest design. Weight Control MSF.

(2)For Pre-Select Stage & Select Stage: 1>Provide loadout, transportation and offshore installation sequence and procedures. 2> Analysis for loadout, transportation, offshore integration and lifting installation conditions. 3> Verify joint connection details. 4> Supply interface reactions or loads to interface. 5>Plan integration concept options. 6> Complete weight control reports in veries revisions for MSF. 7>Analysis SACS Inplace and inpalce fatigue models. 8>ANAYS model analysis for SCFs, padeye etc.

• Kascada (Semi-submersible) topsides structural engineering

Petro-Tech (Jan-March 2010) Offshore Engineering Specialist

• Petro-Tech Peru “San Felipe” jacket detail design and analysis project

Jacket loadout analysis. Jacket transportation analysis. Jacket launch analysis. Jacket ship-impact nonlinear static collapse analysis. Program SAP2000 and SACS calibration analysis for the jacket in-place model. Pile stick-out calculation. Jacket launch cradle design using Roark formula, AISC, DNV buckling check, API RP 2A codes. Conductor wave load and jacket horizontal stiffness analysis. Technical Review and comment for jacket in-place and earthquake models. Weight control. Risers & support attached to jacket model analysis.

Noble Denton Consultants, Inc (March 2003 – Dec2009 ) Principal Engineer
Responsible for performance of relevant engineering work, control management of projects and assignment as necessary in the areas of loadout, transportation, installation engineering, jack-up/hull/semi-submersible/jacket/topside structure analysis, marine warranty and general structural analysis engineering.
• Global Industry Inc. (AmClyde 1200 Crane Transportation) Lower Pedestal, Upper post and Boom transport grillage and seafastening design.
• Jack-up “JP BUSSELL on Board of “M/V Talisman Heavy Lift Ship – MWS Transportation.
Verifications of Cribbing arrangement, motion -Vemas model analysis, stability –Genstab model analysis, seafastening load and arrangement.
• ENI LONGHORN – Modules Load-out, Transportation and Installation Marine Warranty Engineering, inspections.
• Husky Reels Transportation on Vessel “Osprey” - Feasibility study, Analysis and Design.
• Jack-up “Kan Tan IV” Transportation (Dockwise) –MWS review and independent analysis using Vemas& BMF, ND spreadsheet.
• Esso New AG15 – Subsea Structure loadout, transportation and installation marine warranty.
• Transocean Jack-up “Mercury” – Hull Strength Analysis- performed Hull Minimum Scantling Checks.
• Ocean Engineering Jack-up “Ocean Legend” – StruCAD SCF 3D- solid element model NOAH analysis, Global Stick Model Dynamic and Wave response analysis and Mat Top Plate Spectrum Fatigue Analysis. Response to Oceanengineering/ABS comments
• Transocean Jack-up “JT ANGEL”- StruCAD Model Validation and Elevated Analysis of Preload, Drilling and Storm Conditions- Hull both Benchmark and Wastage conditions are Included. Response to Transocean /ABS comments
• Akcacoka TPAO Platform CVA Project - Review, verification and CVA report for in-place analysis
• Thunder Hawk TLP Installation Project – Marine Warranty Service (MWS) review and comments for engineering hull structure loadout onto the transportation vessel.
• Cabinda Gas Project – MWS review and comments for structure load out and transportation analysis.
• Momentum Crane Design project – Engineering re...

Login or Register to view the full resume.