SKILLS & ABILITIES Throughout the years I have built up a wide range of experience within electronics and hardware engineering. I have spent time working with hybrid technology for a twisted pair modem, DSP, RF systems, and motherboard/hardware design. I have some experience working with FPGA and embedded systems as well as software for both. I am a quick and willing learner and am always looking to keep up to date on the newest technology.
EXPERIENCE DIGITAL COMPRESSION TECHNOLOGY
Herndon Va.
July 2014 – Current
Lab / Hardware Engineer
I am responsible for running tests and simulations for a new DSL modem R & D project. I have experience designing and implementing all aspects of hardware for a modem. I personally worked on the Analog front end, motherboard, and isolation hybrid technology. I work hand in hand with FPGA and Embedded systems engineers and have knowledge of software and implementation. I also am proficient in using MATLAB, Xilinx tools, Atmel studios, and Qucs simulations.
I also have worked on schematic layout and reviews. I designed motherboard layouts and schematics and have used Mentor graphics, Express PCB, and AutoCAD. I have been with the project since it was just a patent, so I have experience for an entire system build. I have worked through the R&D stage all the way to production level and am familiar with all of the procedures involved within each stage of a project.
I am also skilled at hands on work within a lab. I am proficient in soldering electronic components large and small and have used all of the electronic tools, such as: Network analyzers, waveform generators, high speed Oscilloscopes, and LCR meters.
RALEIGH ENTERPRISES INC.
May 2012 – July 2014
Interactive Engineer /Project Manager
I have been responsible for managing and engineering multiple jobs at Walt Disney World. My job calls for building and implementing turn-key interactive features to different attractions throughout Disney. This involves designing/planning, building, installing, and maintaining the different interactive experiences throughout Walt Disney World. Within those installations are audio, video, and communication equipment and terminations. I have years of experience in large scale fiber optic terminations. I handle installation of UPS’ within racks. I work hand in hand with Engineers from WDI and manage multiple employees at job locations. I have technical skills in electronics and troubleshooting.
I have the experience of working on large scale attractions as well as smaller more detail driven jobs.
ERMCO OF FLORIDA
May 2006 – April 2012
Lead Technician / Data Center Tech.
I was in charge of installing network and data infrastructure within the Walt Disney World, Universal Studios, and Sea World. This involved fiber optic terminations, copper networking, VTC’s, and camera installations. I also had the privilege of doing work within the Walt Disney World data center for 3 years. While there, I managed the network infrastructure of the entire data...
Login or Register to view the full resume.